Zuyd was commissioned by Giesbers Ontwikkelen en Bouwen to realise the interior construction of this challenging project. The design realised by RAU architects was upgraded to UO level in a construction team context. A CLT shell in combination with dry interior construction systems requires the necessary modifications in terms of detailing and construction method. Together with the building team and Volantis, Zuyd also managed to optimise the performance of the walls.

KC Meerdijk is qualified as a Fresh School, making it a pleasant learning and working environment for pupils and staff.

Client:
Giesbers Ontwikkelen en Bouwen

In the context of recognisability, each toilet group is finished in a different colour. Zuyd, for instance, coated the walls and doors with a multi-layer washable coating. Also, the dry finish components are seamlessly integrated into the customised interior.

The desire was to leave as much of the CLT building structure visible as possible. To meet the highest performance requirements, the use of metal stud walls was necessary, but Zuyd was allowed to finish most of the walls with wooden 3S boards. As a result, the desired appearance was still largely achieved.

/ Working method

Other interior construction projects by Zuyd:

BUILDINGS WHERE PEOPLE AND BRAND COME INTO THEIR OWN.

/ Contact
Website by Tundra